Join the Index
Sectors Data Centre & Digital Infrastructure Data centre construction
Capability Data Centre & Digital Infrastructure

Data centre construction in Singapore

On the record
19
Governing standards
Uptime Institute Tier (Constructed Facility), BCA Green Mark
Sector
Data Centre & Digital Infrastructure

The building and interior fit-out of data centre facilities: civil and structural works, the white-space data hall, raised flooring, containment, and integration of power and cooling to an operational, commissioned state.

Delivered design-build or as fit-out to a base building. Buyers select on Tier certification and commissioning record. The companies on the record holding this capability are collected on the Singapore Industry Index’s list of Leading data centre companies in Singapore.

The field

Singapore is the densest data-centre market in Southeast Asia — historically home to well over half the region's capacity and more than 1 GW of live IT load — yet for three years it barely built: alarmed by data centres drawing an estimated 7% of national electricity, the government imposed a de-facto moratorium on new data-centre construction from 2019, lifted only in 2022. The controlled restart came through a pilot allocation of about 80 MW awarded in 2023 to a short list of operators, and construction demand now runs well ahead of supply. The buyer here is emphatically not the builder: hyperscalers (Microsoft, Google, AWS), colocation operators and REITs (Equinix, STT GDC, Keppel DC REIT, Digital Realty, Princeton Digital Group, AirTrunk, Empyrion) commission the facility and set the specification; the record below is the firms that physically pour, erect and fit out those buildings. The construction stack splits cleanly: the turnkey DC main contractor who takes the shell-and-core and often the full building (BCA workhead CW01 General Building), and the specialist M&E / white-space fit-out contractor who installs the critical power and cooling trains inside it (BCA mechanical and electrical workheads — e.g. Kienta at ACMV/Electrical/IBS L6).

What distinguishes a genuine DC builder from a general contractor is fluency in the operator's real currency: Uptime Institute Tier III/IV redundancy (N+1, 2N power and cooling), speed-to-power, and increasingly DfMA / precast and modular construction to compress programme. The policy frame has now shifted from restraint to conditional growth: the Green Data Centre Roadmap (2024) signalled at least 300 MW of new capacity to be released to operators meeting stringent energy-efficiency and green-energy conditions, on top of green-financed uplifts. That roadmap, plus the AI-driven demand for high-density GPU halls, is what puts a fresh premium on contractors who can prove a sourced Singapore data-centre track record — the scarce credential this record is built to verify. Confirmed builders below range from Japanese majors with local entities (Obayashi, Takenaka, Kajima, Sato Kogyo) through the integrated M&E houses carried forward from the Construction sector, to SG design-builders (Boustead Projects, Woh Hup, Gammon) and DC-specialist fit-out firms (Kienta, Exyte).

Also known as
data centre fit-outdata center constructiondesign and buildwhite space fit-outdata hall fit-outturnkey data centre
On the record

Companies with this capability in Singapore

Listed alphabetically. Order does not indicate ranking.

19 companies
01
Bachy Soletanche Singapore

The Singapore arm of the Soletanche Bachy group (VINCI), a long-standing local operator. Core specialism in diaphragm walls (including the Hydrofraise cutter for deep, hard-ground panels), ground engineering and tunnelling; a long MRT station and tunnel track record (Bugis, Orchard, Riviera, Tanjong Rhu).

02
Boustead Projects

A Singapore design-and-build specialist in industrial and high-tech facilities, named among Singapore's data-centre construction contractors.

03
CSC Holdings Limited

The largest listed piling and foundation group in Singapore, around 1,500 staff across Singapore and Malaysia. Self-performs large-diameter bored piles, diaphragm walls, ground improvement, driven piles, jack-in piles and micro piles, plus soil investigation, pile testing, instrumentation and tunnel monitoring.

04
Cyclect Group

One of Singapore's most established M&E and MEICA (multi-discipline systems-integration) groups, delivering integrated energy solutions across cooling, solar, cogeneration and heat recovery plus integrated facilities management, and holding the BCA ME05 L6 electrical register grade. Sectors served: data centres, semiconductor, pharma, F&B and chemicals manufacturing, infrastructure (airports, ports, water and waste-to-energy) and marine. HQ at Tuas View Crescent.

05
DLE M&E Pte Ltd

Registered ME15 (Integrated Building Services) L6; fully integrated M&E across electrical, ACMV, fire protection, plumbing and sanitary and BIM, across residential, commercial, hospitality, retail and industrial projects.

06
DLM Pte Ltd

Holds unrestricted BCA L6 across ME01 (ACMV), ME05 (Electrical) and ME15 (Integrated Building Services). Builds and maintains M&E for data centres (Tier redundancy, liquid cooling), advanced manufacturing and semiconductors, cleanrooms and pharma labs, with LV/HV maintenance, transformer and HT switchgear testing and AI-driven chiller and energy optimisation.

07
Dragages Singapore

Bouygues Construction's Singapore arm and a BCA/SCI full-certificate PPVC manufacturer, operating a PPVC and precast facility at Jurong Port; a major PPVC main-contractor on large residential and institutional projects.

08
Exyte

A global engineer-procure-construct group and one of the world's leading builders of semiconductor fabs and high-tech cleanroom facilities, with a long-established Singapore presence and award-winning local fab projects (including for GlobalFoundries). Serves semiconductors, biopharma and data centres — the reference standard for turnkey fab EPC in the region.

09
Gammon Pte Limited

A major building and civil contractor at BCA ME12 L4, carried to self-deliver plumbing and sanitary work within its own main-contract projects.

10
Kajima Overseas Asia

The Singapore regional entity of Kajima, listed among Singapore's data-centre construction contractors; active in industrial and commercial building.

11
Kienta Engineering Construction

A Singapore builder naming data-centre construction as a core area of expertise, spanning greenfield and brownfield. Holds BCA registrations including ACMV L6, Electrical Engineering L6 and Integrated Building Services L6, positioning it across both main-build and specialist white-space and M&E fit-out.

12
Lendlease Singapore

An established Singapore main contractor and developer with large-scale building capability, named among Singapore's data-centre construction contractors.

13
Obayashi Singapore

The Singapore arm of the Japanese major, named among Singapore's active data-centre contractors and carrying data-centre work in its local portfolio; delivers full building construction for high-tech and industrial facilities.

14
Sato Kogyo (S)

The Singapore arm of the Japanese contractor, listed among Singapore's data-centre construction contractors; an established industrial and civil builder.

15
Takenaka (Singapore)

A Japanese general-contractor major listed among Singapore's data-centre construction contractors; builds large-scale industrial and commercial facilities.

16
UG M&E Pte Ltd

Carries one of the fullest L6 stacks on the BCA ME register — ME01 (ACMV) L6, ME05 (Electrical) L6, ME11 (Mechanical Engineering) L6 and ME15 (Integrated Building Services) L6 — as a specialist in integrated M&E installation.

17
Wah Loon Engineering

A full-scope integrated M&E contractor across Singapore and Malaysia, part of VINCI Energies, self-performing mechanical, electrical, air-conditioning and mechanical ventilation, systems integration and fire protection within building packages. One of the larger established M&E houses, active in data-centre and industrial M&E.

18
Woh Hup

A nine-decade Singapore builder that constructed Keppel Data Centre Singapore 8 on Genting Lane — a six-storey purpose-built carrier-neutral colocation data centre awarded BCA Green Mark Platinum. A confirmed, own-site-sourced data-centre main contractor.

19
Yongnam Holdings

A leading Singapore-based multi-discipline structural-steel and specialist-civil contractor covering engineering coordination, detailing, fabrication and erection across Singapore, Malaysia, Thailand and Hong Kong, and the region's dominant supplier of reusable steel struts for ERSS and deep excavation. Reference work spans aircraft hangars, high-rise, MRT and airport infrastructure.

ENQUIRE

Not sure which supplier?

Tell the Singapore Industry Index what you need — this enquiry is tagged to Data centre construction — and we'll point you to the companies on the record that do it. To reach one company directly, enquire from its profile above.